Koodaideri Mine Construction Project NPI Bulk Earthworks

Client:                   Hicks civil and mining Project Value:    $2.6B Contract Value: $600K   Survey Logic conducted the Non-Process Infrastructure Bulk Earthworks set-out, as-constructed and conformance surveys for HCM for this project. The scope of the works included preparation of borrow pit plans, volume and conformance surveys, machine control equipment hire, machine control system setup, design […]

Koodaideri Mine Construction Project

Client:                   Primero Group Project Value:    $2.6B Contract Value: $1.4M   Survey Logic conducted the Non-Process Infrastructure set out, as-constructed and conformance surveys for Primero Group for the construction of all civils and SMP construction for the NPI construction on this project. The scope of works included the survey and alignment of over 150m […]

Pilbara Transmission Project

Client:                   Iron Mine Contracting / NEMMS JV Project Value:    $250M Contract Value: $750K   Survey Logic conducted the surveying services for the construction of the 275Km of transmission line power pole earthworks pads for the FMG Pilbara transmission project.  We conducted all the environmental setting out, and surveys to ensure all works were […]

Dampier Ports Maintenance Surveys

Client:                   Rio Tinto Contract value: $150K   Survey Logic is the preferred supplier of conveyor and machinery alignment surveys for Rio Tinto at the Dampier Port operations. With an ongoing maintenance regime in place, our surveyors are regularly performing alignment and investigative surveys for mechanical plant at the port operations to provide valuable insight […]